OVERVIEW 

– Pyrolite tips designed for use with both ground base and truck monitors
– Allows for concentrated waterflow and longer reach
– Triple stacked tips have 1”, 1 -1/8” and 1 -1/4” standard orifices
– Quad stacked tips have 1 -3/8”, 1 -1/2”, 1-3/4” and 2” standard orifices

Please contact us for information on optional orifices and other tips available