OVERVIEW 
  • Pyrolite tips designed for use with both ground base and truck monitors
  • Allows for concentrated waterflow and longer reach
  • Triple stacked tips have 1”, 1 -1/8” and 1 -1/4” standard orifices
  • Quad stacked tips have 1 -3/8”, 1 -1/2”, 1-3/4” and 2” standard orifices
Please contact us for information on optional orifices and other tips available